Difference between revisions of "Semmering Railway" - New World Encyclopedia

From New World Encyclopedia
m
 
(21 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 +
{{Approved}}{{Images OK}}{{Submitted}}{{copyedited}}
 
{{Infobox World Heritage Site
 
{{Infobox World Heritage Site
 
| WHS        = Semmering Railway
 
| WHS        = Semmering Railway
Line 11: Line 12:
 
| Link        = http://whc.unesco.org/en/list/785
 
| Link        = http://whc.unesco.org/en/list/785
 
}}
 
}}
The '''Semmering Railway''', [[Austria]], which starts at [[Gloggnitz]] and leads over the [[Semmering pass]] to [[Mürzzuschlag]] was the first [[mountain]] [[Rail transport|railway]] in [[Europe]] built with a [[standard gauge]] track. It is commonly referred to as the world's first true mountain railway, given the very difficult terrain and the considerable altitude difference that was mastered during its [[construction]]. It is also described as the first ‘imperial’ railway because it linked the capital of [[Vienna]] with Austria’s [[Italy|Italian]] possessions to the south.
+
The '''Semmering Railway,''' in [[Austria]], which starts at [[Gloggnitz]] and leads over the [[Semmering pass]] to [[Mürzzuschlag]], was the first [[mountain]] [[Rail transport|railway]] in [[Europe]] built with a [[standard gauge]] track. It is commonly referred to as the world's first true mountain railway, given the very difficult terrain and the considerable altitude difference that was mastered during its [[construction]]. It is also described as the first "imperial" railway because it linked the capital of [[Vienna]] with Austria’s [[Italy|Italian]] possessions to the south.
 +
{{toc}}
 +
The pioneering design by [[Carl Ritter von Ghegain]] set the standard for alpine railways on long, steep escarpments. It is  still fully functional as a part of the [[Austrian Southern Railway]]. In 1998, it was named a [[World Heritage Site]] and in 2004, it celebrated its 150th anniversary.
  
The pioneering design by [[Carl Ritter von Ghegain]] set the standard for alpine railways on long, steep escarpments. It is located at N47 38 55.6 E15 49 40.7 and is still fully functional as a part of the [[Austrian Southern Railway]]. In 1998 it was named a [[World Heritage Site]] and in 2004 it celebrated its 150th anniversary.
 
 
==Background==
 
==Background==
 +
The Semmering Railway was named a World Heritage Site in 1998, after it was determined it had outstanding universal value and it met two of the 10 selection criteria.
  
The Semmering Railway was named a World Heritage Site in 1998 after it was determined it had outstanding universal value and it met two of the 10 selection criteria.
+
The first criteria it met was that it represents an outstanding [[Technology|technological]] solution to a major physical problem in the construction of early [[Rail transport|railways]].
 
 
The first criteria it met was that it represents an outstanding [[tehcnology|technological]] solution to a major physical problem in the construction of early [[Rail transport|railways]].
 
  
 
Second, with the construction of the Semmering Railway, areas of great natural beauty became more easily accessible and as a result these were developed for residential and recreational use, creating a new form of cultural landscape.
 
Second, with the construction of the Semmering Railway, areas of great natural beauty became more easily accessible and as a result these were developed for residential and recreational use, creating a new form of cultural landscape.
  
 
==History==
 
==History==
When the first road over the Semmering was completed in the reign of [[Charles VI, Holy Roman Emperor|Karl VI]] in the early 18th century an important step was taken towards opening this heavily [[forest]]ed area.
+
When the first road over the Semmering was completed in the reign of [[Charles VI, Holy Roman Emperor|Karl VI]], in the early eighteenth, century an important step was taken towards opening this heavily [[forest]]ed area.
  
The extremely dangerous gradients of the old pass road led to plans for a new route over the pass at the beginning of the 19th century. But it was only in the years between 1839 and 1841 that the second road connection over the Semmering was rapidly built.
+
The extremely dangerous gradients of the old pass road led to plans for a new route over it at the beginning of the nineteenth century. But it was only in the years between 1839 and 1841 that the second road connection over the Semmering was rapidly built.
  
About the same time two important railway lines were constructed, one from [[Vienna]] to Gloggnitz, and the other from Mürzzuschlag to Bruck an der Mur. Both started operations in 1842.<ref>[http://www.semmering.or.at/en/history/history.html History of the Semmering] ''Semmering.or.at.'' Retrieved July 7, 2008.</ref>  
+
About the same time, two important railway lines were constructed, one from [[Vienna]] to Gloggnitz, and the other from Mürzzuschlag to Bruck an der Mur. Both started operations in 1842.<ref>Semmering.or.at, [http://www.semmering.or.at/en/history/history.html History of the Semmering.] Retrieved July 7, 2008.</ref>  
 
[[Image:6010013 Kalte Rinne Semmering.jpg|thumb|200px|Express railcar on the Kalte Rinne viaduct on the Semmering line.]]
 
[[Image:6010013 Kalte Rinne Semmering.jpg|thumb|200px|Express railcar on the Kalte Rinne viaduct on the Semmering line.]]
  
The Semmering line, engineered by [[Carl Ritter von Ghega]], runs from Gloggnitz to Murzzuschlag, crosses the high Alps in a 42km (26 mile) long section known as the Semmering Pass. It still forms part of the railway from Vienna in Austria to Italy and Slovenia. The Adriatic port of Trieste had special importance as part of the Austro-Hungarian Empire: since it was the only access the state had to the sea, an efficient railway connection was of the utmost importance.<ref>[http://www.icomos.org/studies/railways.htm#42 Case 2: The Semmering Pass, Austria] ''Icomos.org.'' Retrieved July 7, 2008.</ref>
+
An Imperial Edict for a line over the Semmering was passed in 1844, but the original plans were shelved after doubts about tunneling. The [[revolution of 1848]], in Vienna, changed the political climate and increased pressure for the line’s construction.
  
An Imperial Edict for a line over the Semmering was passed in 1844, but the original plans were shelved after doubts over tunneling. The revolution of 1848 in Vienna changed the political climate and increased pressure for the line’s construction.
+
The Semmering line, engineered by [[Carl Ritter von Ghega]], runs from Gloggnitz to Murzzuschlag, crosses the high Alps in a 42 km (26 mile) long section known as the Semmering Pass. It still forms part of the railway from Vienna in Austria to Italy and Slovenia. The Adriatic port of Trieste had special importance as part of the [[Austro-Hungarian Empire]]: Since it was the only access the state had to the sea, an efficient railway connection was of the utmost importance.<ref>Icomos.org, [http://www.icomos.org/studies/railways.htm#42 Case 2: The Semmering Pass, Austria.] Retrieved July 7, 2008.</ref>
  
The Semmering Railway was constructed between 1848 and 1854 by some 20,000 workers. The construction features 14 [[tunnel]]s, 16 [[viaduct]]s (several two-story) and over 100 curved stone [[bridge]]s as well as 11 small [[iron]] bridges. The stations and the buildings for the supervisors were often built directly from the waste material produced in the course of tunnel construction.
+
The Semmering Railway was constructed between 1848 and 1854, by roughly 20,000 workers. The construction features 14 [[tunnel]]s, 16 [[viaduct]]s (several two-story), and over 100 curved stone [[bridge]]s, as well as 11 small [[iron]] bridges. The stations and the buildings for the supervisors were often built directly from the waste material produced in the course of tunnel construction.
[[Image:Semmeringbahn 01.jpg|left|thumb|Semmering Railway with surrounding mountain scenery]]
+
[[Image:Semmeringbahn 01.jpg|left|thumb|Semmering Railway with surrounding mountain scenery.]]
[[Image:Semmering-09594vc.jpg|left|thumb|Semmering Railway at Mürzzuschlag, around 1900]]
+
[[Image:Semmering-09594vc.jpg|left|thumb|Semmering Railway at Mürzzuschlag, around 1900.]]
  
Across an overall track length of 41 km the Semmering Railway was quite daring for its time; it had a maximum gradient five times that of previous railways. This was an entirely new technical dimension for railway construction, and new instruments and methods of [[surveying]] had to be developed to handle the resulting challenges. Also, new technologies were employed for the Engerth [[locomotive]]s because the types in general use at this time could not handle the extreme gradients and turning radii.
+
Across an overall track length of 41 km, the Semmering Railway was quite daring for its time; it had a maximum gradient five times that of previous railways. This was an entirely new technical dimension for railway construction, and new instruments and methods of [[surveying]] had to be developed to handle the resulting challenges. Also, new technologies were employed for the Engerth [[locomotive]]s because the types in general use at this time could not handle the extreme gradients and turning radii.
  
While being built the Semmering Railway was a deliberate attempt to be a harmonious combination of [[technology]] and [[nature]]. The unique travel experience that the Semmering Railway offered contributed significantly to the original opening of the Semmering region to [[tourism]].  
+
While being built, the Semmering Railway was a deliberate attempt to be a harmonious combination of [[technology]] and [[nature]]. The unique travel experience that the Semmering Railway offered contributed significantly to the original opening of the Semmering region to [[tourism]].  
  
 
The Semmering railway line is part of the Südbahn railway that runs between [[Vienna]] and Graz, continuing on to Maribor, Ljubljana and eventually to Trieste.
 
The Semmering railway line is part of the Südbahn railway that runs between [[Vienna]] and Graz, continuing on to Maribor, Ljubljana and eventually to Trieste.
 
 
  
 
===Semmering Pass===
 
===Semmering Pass===
The Semmering is a mountain pass in the Eastern Northern Limestone [[Alps]] that forms a natural border between Lower Austria and [[Styria]]. The Semmering Railway passes 282 ft. below the summit of the Semmering Pass (3215 ft./980 meters) by tunnel.
+
The Semmering is a mountain pass in the Eastern Northern Limestone [[Alps]] that forms a natural border between Lower Austria and [[Styria]]. The Semmering Railway passes 282 ft below the summit of the Semmering Pass (3215 ft/980 meters) by tunnel.
  
The railway led to the development of a vacation resort for the people of Vienna and the construction of several hotels. In the early 1900s the hotels on the Semmering were among the leading hotels of the Alps, and hosted high-class visitors from throughout the [[Austrian Empire]]. The leading hotels - the ''Panhans'', ''Südbahnhotel'' and ''Erzherzog Johann'' - were joined in 1909 by a fourth luxury hotel, the ''Semmeringer Kurhaus''. During [[World War I]], it was known as the ''Physical-Dietetic Mountain Convalescent Home'' and served as an exclusive convalescent home for officers.<ref>[http://www.alma-mahler.at/engl/gallery/spielort_semmering.html The Kurhaus Sanatorium on the mountain of Semmering] ''Alma-mahler.at.'' Retrieved June 29, 2008.</ref>
+
The railway led to the development of a vacation resort for the people of Vienna and the construction of several hotels. In the early 1900s, the hotels on the Semmering were among the leading hotels of the Alps, and hosted high-class visitors from throughout the [[Austrian Empire]]. The leading hotels--the ''Panhans,'' ''Südbahnhotel,'' and ''Erzherzog Johann''--were joined in 1909, by a fourth luxury hotel, the ''Semmeringer Kurhaus''. During [[World War I]], it was known as the ''Physical-Dietetic Mountain Convalescent Home'' and served as an exclusive convalescent home for officers.<ref>Alma-mahler.at, [http://www.alma-mahler.at/engl/gallery/spielort_semmering.html The Kurhaus Sanatorium on the mountain of Semmering.] Retrieved June 29, 2008.</ref>
  
In December 1938, the Kurhaus was taken over by the [[Wehrmacht]] and converted into a "German military convalescent hospital", where leading figures of the [[Third Reich]] went to convalesce.  
+
In December 1938, the Kurhaus was taken over by the [[Wehrmacht]] and converted into a "German military convalescent hospital," where leading figures of the [[Third Reich]] went to convalesce.  
  
 
Following [[World War II]], the [[Russia]]ns occupied the Kurhaus, as the boundary with the [[Great Britain|British]] zone ran exactly along the Semmering Pass.
 
Following [[World War II]], the [[Russia]]ns occupied the Kurhaus, as the boundary with the [[Great Britain|British]] zone ran exactly along the Semmering Pass.
Line 57: Line 56:
 
Steam locomotives worked the route for a century, but electrification took place between 1956 and 1959.  
 
Steam locomotives worked the route for a century, but electrification took place between 1956 and 1959.  
  
Today [[winter sports]] and Summer [[hiking]] are the top draws for the town. The Semmering [[Skiing|ski resort]], which hosts [[Alpine skiing World Cup]] events, is located at the pass and extends on the Hirschenkogel mountain. Today it is mainly used by skiers from Vienna, from where it can be reached within one hour, but increasingly is used by skiers from [[Hungary]] and [[Slovakia]].
+
Today, [[winter sports]] and Summer [[hiking]] are the top draws for the town. The Semmering [[Skiing|ski resort]], which hosts [[Alpine skiing World Cup]] events, is located at the pass and extends on the Hirschenkogel mountain. Today, it is mainly used by skiers from Vienna, from where it can be reached within one hour, but increasingly is used by skiers from [[Hungary]] and [[Slovakia]].
  
==Carl Ritter von Ghega==
+
==Designer==
Born in Venice, in an [[Albania]]n family, he studied in Padua, where he took the examination for doctor of [[mathematics]] at the age of 18. He began his [[engineering]] career with road and hydraulic engineering in Venice. From 1836 to 1840 he was a construction supervisor for the railway track from Brno to Breclav, the so called Emperor Ferdinand North Railway. During this time he studied the railways in [[England]] and other [[Europe]]an countries.
 
 
[[Image:Ghega-lithografie-kriehuber-1851.jpg|thumb|225px|left|Karl Ritter von Ghega; Lithography by [[Joseph Kriehuber]], 1851]]
 
[[Image:Ghega-lithografie-kriehuber-1851.jpg|thumb|225px|left|Karl Ritter von Ghega; Lithography by [[Joseph Kriehuber]], 1851]]
In 1842, entrusted with the entire planning of the future state railway, he made a study trip to [[North America]]. After his return he began planning the railway line from Mürzzuschlag to Graz and Trieste. In October 1844 the section of track between Graz and Mürzzuschlag was opened. The crossing of the Semmering was not believed possible, but as early as 1844 he submitted a plan for [[locomotives]] without an extra rail for gear wheels. Before the plan was even accepted he began to enforce the construction of locomotives that could overcome the challenging gradients of Semmerling pass.  
+
[[Karl Ritter von Ghega]] was the designer of the Semmering Railway. Born in Venice, in an [[Albania]]n family, he studied in Padua, where he took the examination for doctor of [[mathematics]] at the age of 18. He began his [[engineering]] career with road and hydraulic engineering in Venice. From 1836 to 1840, he was a construction supervisor for the railway track from Brno to Breclav, the so called Emperor Ferdinand North Railway. During this time, he studied the railways in [[England]] and other [[Europe]]an countries.
 +
In 1842, entrusted with the entire planning of the future state railway, he made a study trip to [[North America]]. After his return he began planning the railway line from Mürzzuschlag to Graz and Trieste. In October 1844, the section of track between Graz and Mürzzuschlag was opened. The crossing of the Semmering was not believed possible, but as early as 1844, he submitted a plan for [[locomotives]] without an extra rail for gear wheels. Before the plan was even accepted, he began to enforce the construction of locomotives that could overcome the challenging gradients of Semmerling pass.  
  
Ghega rejected the use of [[iron]] and [[steel]] as a matter of principle, which explains the "bricked railway" consisting of 65 million [[brick]]s and 80,000 [[flagstone]]s. At the beginning of [[construction]] work about 5,000 workmen a day were transported from Vienna to the building sites and back. For this labor intensive project about 20,000 people were employed at the peak of construction. All digging and tunneling had to be done by hand as there were neither tunnel-drilling-machines nor strong blasting substances like [[dynamite]] available at the time.
+
Ghega rejected the use of [[iron]] and [[steel]] as a matter of principle, which explains the "bricked railway" consisting of 65 million [[brick]]s and 80,000 [[flagstone]]s. At the beginning of [[construction]] work, about 5,000 workmen a day were transported from Vienna to the building sites and back. For this labor intensive project, about 20,000 people were employed at the peak of construction. All digging and tunneling had to be done by hand as there were neither tunnel-drilling-machines nor strong blasting substances like [[dynamite]] available at the time.
  
Before its completion in 1854 von Ghega became a knight (Ritter).
+
Before its completion in 1854, von Ghega became a knight (Ritter).
  
 
He was next assigned to the building of a railway in [[Transylvania]], but he died in Vienna from [[tuberculosis]] before it could be completed.
 
He was next assigned to the building of a railway in [[Transylvania]], but he died in Vienna from [[tuberculosis]] before it could be completed.
  
Apart from the electrification of the line and the construction of a new, second Semmering tunnel from 1949 to 1952, today’s railway is still substantially that designed by von Ghega and stands as a continuing testament to his [[engineering]] genius.
+
Apart from the electrification of the line and the construction of a new, second Semmering tunnel from 1949 to 1952, today’s railway is still substantially that designed by von Ghega and stands as a continuing testament to his [[engineering]] genius.
  
 
==Notes==
 
==Notes==
Line 76: Line 75:
  
 
==References==
 
==References==
*Coulls, Anthony. 1999. [http://www.icomos.org/studies/railways.htm#42 Railways as World Heritage Sites] ''Icomos.org. ''
+
* Coulls, Anthony. 1999. [http://www.icomos.org/studies/railways.htm#42 Case 2: The Semmering Pass, Austria.] ''Railways as World Heritage Sites''. Retrieved July 17, 2008.
*[http://www.semmering.or.at/en/welcome.html Semmering the Magic Mountain] ''Semmering.or.at.''
+
* Steiner, Franz R. [http://www.semmering.or.at/en/welcome.html Semmering the Magic Mountain.] ''Semmering Tourism.'' Retrieved July 17, 2008.
*[http://whc.unesco.org/en/list/785 World Heritage Site] ''Whc.unesco.org.''
+
* ''UNESCO World Heritage Centre''. [http://whc.unesco.org/en/list/785 Semmering Railway.] Retrieved July 17, 2008.
  
 
==External links==
 
==External links==
*[http://www.niederoesterreich.at/partner/trsued/whsemmeringbahn/hist_E.htm History of the building of the Semmering-Railway]
+
All links retrieved January 25, 2023.  
*Ole Oest. 2007. [http://www.oestfamily.com/SemmeringBahnPano.htm Semmering Railway, Austria]   
+
*Ole Oest. [http://www.oestfamily.com/SemmeringBahnPano.htm Semmering Railway, Austria]   
 
*[http://www.ebepe.com/html/semmering_1e.html Photo tour of Semmering Railway]
 
*[http://www.ebepe.com/html/semmering_1e.html Photo tour of Semmering Railway]
*[http://www.worldheritagesite.org/countries/austria.html Austria's World Heritage Sites]
+
 
*[http://austria-360.at/index-wh.html Austria 360]
 
*James Martin. 2006. [http://goeurope.about.com/od/scenictraintravel/ss/austria_trains_2.htm Scenic Train Routes in Austria] ''Goeurope.about.com.''
 
  
 
[[Category:World Heritage Site]]
 
[[Category:World Heritage Site]]
[[Category:Nations and places]]
+
[[Category:Geography]]
 
[[Category:Historical Sites]]
 
[[Category:Historical Sites]]
[[Category:Western Europe]]
+
[[Category:Europe]]
  
 
{{Credit|Semmering_Railway|214301094|Carl_Ritter_von_Ghega|212480514|Semmering_Pass|209624414}}
 
{{Credit|Semmering_Railway|214301094|Carl_Ritter_von_Ghega|212480514|Semmering_Pass|209624414}}

Latest revision as of 09:44, 26 January 2023

Semmering Railway*
UNESCO World Heritage Site

Semmering Railway viaduct, around 1900
State Party Flag of Austria Austria
Type Cultural
Criteria ii, iv
Reference 785
Region** Europe
Inscription history
Inscription 1998  (22nd Session)
* Name as inscribed on World Heritage List.
** Region as classified by UNESCO.

The Semmering Railway, in Austria, which starts at Gloggnitz and leads over the Semmering pass to Mürzzuschlag, was the first mountain railway in Europe built with a standard gauge track. It is commonly referred to as the world's first true mountain railway, given the very difficult terrain and the considerable altitude difference that was mastered during its construction. It is also described as the first "imperial" railway because it linked the capital of Vienna with Austria’s Italian possessions to the south.

The pioneering design by Carl Ritter von Ghegain set the standard for alpine railways on long, steep escarpments. It is still fully functional as a part of the Austrian Southern Railway. In 1998, it was named a World Heritage Site and in 2004, it celebrated its 150th anniversary.

Background

The Semmering Railway was named a World Heritage Site in 1998, after it was determined it had outstanding universal value and it met two of the 10 selection criteria.

The first criteria it met was that it represents an outstanding technological solution to a major physical problem in the construction of early railways.

Second, with the construction of the Semmering Railway, areas of great natural beauty became more easily accessible and as a result these were developed for residential and recreational use, creating a new form of cultural landscape.

History

When the first road over the Semmering was completed in the reign of Karl VI, in the early eighteenth, century an important step was taken towards opening this heavily forested area.

The extremely dangerous gradients of the old pass road led to plans for a new route over it at the beginning of the nineteenth century. But it was only in the years between 1839 and 1841 that the second road connection over the Semmering was rapidly built.

About the same time, two important railway lines were constructed, one from Vienna to Gloggnitz, and the other from Mürzzuschlag to Bruck an der Mur. Both started operations in 1842.[1]

Express railcar on the Kalte Rinne viaduct on the Semmering line.

An Imperial Edict for a line over the Semmering was passed in 1844, but the original plans were shelved after doubts about tunneling. The revolution of 1848, in Vienna, changed the political climate and increased pressure for the line’s construction.

The Semmering line, engineered by Carl Ritter von Ghega, runs from Gloggnitz to Murzzuschlag, crosses the high Alps in a 42 km (26 mile) long section known as the Semmering Pass. It still forms part of the railway from Vienna in Austria to Italy and Slovenia. The Adriatic port of Trieste had special importance as part of the Austro-Hungarian Empire: Since it was the only access the state had to the sea, an efficient railway connection was of the utmost importance.[2]

The Semmering Railway was constructed between 1848 and 1854, by roughly 20,000 workers. The construction features 14 tunnels, 16 viaducts (several two-story), and over 100 curved stone bridges, as well as 11 small iron bridges. The stations and the buildings for the supervisors were often built directly from the waste material produced in the course of tunnel construction.

Semmering Railway with surrounding mountain scenery.
Semmering Railway at Mürzzuschlag, around 1900.

Across an overall track length of 41 km, the Semmering Railway was quite daring for its time; it had a maximum gradient five times that of previous railways. This was an entirely new technical dimension for railway construction, and new instruments and methods of surveying had to be developed to handle the resulting challenges. Also, new technologies were employed for the Engerth locomotives because the types in general use at this time could not handle the extreme gradients and turning radii.

While being built, the Semmering Railway was a deliberate attempt to be a harmonious combination of technology and nature. The unique travel experience that the Semmering Railway offered contributed significantly to the original opening of the Semmering region to tourism.

The Semmering railway line is part of the Südbahn railway that runs between Vienna and Graz, continuing on to Maribor, Ljubljana and eventually to Trieste.

Semmering Pass

The Semmering is a mountain pass in the Eastern Northern Limestone Alps that forms a natural border between Lower Austria and Styria. The Semmering Railway passes 282 ft below the summit of the Semmering Pass (3215 ft/980 meters) by tunnel.

The railway led to the development of a vacation resort for the people of Vienna and the construction of several hotels. In the early 1900s, the hotels on the Semmering were among the leading hotels of the Alps, and hosted high-class visitors from throughout the Austrian Empire. The leading hotels—the Panhans, Südbahnhotel, and Erzherzog Johann—were joined in 1909, by a fourth luxury hotel, the Semmeringer Kurhaus. During World War I, it was known as the Physical-Dietetic Mountain Convalescent Home and served as an exclusive convalescent home for officers.[3]

In December 1938, the Kurhaus was taken over by the Wehrmacht and converted into a "German military convalescent hospital," where leading figures of the Third Reich went to convalesce.

Following World War II, the Russians occupied the Kurhaus, as the boundary with the British zone ran exactly along the Semmering Pass.

Steam locomotives worked the route for a century, but electrification took place between 1956 and 1959.

Today, winter sports and Summer hiking are the top draws for the town. The Semmering ski resort, which hosts Alpine skiing World Cup events, is located at the pass and extends on the Hirschenkogel mountain. Today, it is mainly used by skiers from Vienna, from where it can be reached within one hour, but increasingly is used by skiers from Hungary and Slovakia.

Designer

Karl Ritter von Ghega; Lithography by Joseph Kriehuber, 1851

Karl Ritter von Ghega was the designer of the Semmering Railway. Born in Venice, in an Albanian family, he studied in Padua, where he took the examination for doctor of mathematics at the age of 18. He began his engineering career with road and hydraulic engineering in Venice. From 1836 to 1840, he was a construction supervisor for the railway track from Brno to Breclav, the so called Emperor Ferdinand North Railway. During this time, he studied the railways in England and other European countries. In 1842, entrusted with the entire planning of the future state railway, he made a study trip to North America. After his return he began planning the railway line from Mürzzuschlag to Graz and Trieste. In October 1844, the section of track between Graz and Mürzzuschlag was opened. The crossing of the Semmering was not believed possible, but as early as 1844, he submitted a plan for locomotives without an extra rail for gear wheels. Before the plan was even accepted, he began to enforce the construction of locomotives that could overcome the challenging gradients of Semmerling pass.

Ghega rejected the use of iron and steel as a matter of principle, which explains the "bricked railway" consisting of 65 million bricks and 80,000 flagstones. At the beginning of construction work, about 5,000 workmen a day were transported from Vienna to the building sites and back. For this labor intensive project, about 20,000 people were employed at the peak of construction. All digging and tunneling had to be done by hand as there were neither tunnel-drilling-machines nor strong blasting substances like dynamite available at the time.

Before its completion in 1854, von Ghega became a knight (Ritter).

He was next assigned to the building of a railway in Transylvania, but he died in Vienna from tuberculosis before it could be completed.

Apart from the electrification of the line and the construction of a new, second Semmering tunnel from 1949 to 1952, today’s railway is still substantially that designed by von Ghega and stands as a continuing testament to his engineering genius.

Notes

  1. Semmering.or.at, History of the Semmering. Retrieved July 7, 2008.
  2. Icomos.org, Case 2: The Semmering Pass, Austria. Retrieved July 7, 2008.
  3. Alma-mahler.at, The Kurhaus Sanatorium on the mountain of Semmering. Retrieved June 29, 2008.

References
ISBN links support NWE through referral fees

External links

All links retrieved January 25, 2023.

Credits

New World Encyclopedia writers and editors rewrote and completed the Wikipedia article in accordance with New World Encyclopedia standards. This article abides by terms of the Creative Commons CC-by-sa 3.0 License (CC-by-sa), which may be used and disseminated with proper attribution. Credit is due under the terms of this license that can reference both the New World Encyclopedia contributors and the selfless volunteer contributors of the Wikimedia Foundation. To cite this article click here for a list of acceptable citing formats.The history of earlier contributions by wikipedians is accessible to researchers here:

The history of this article since it was imported to New World Encyclopedia:

Note: Some restrictions may apply to use of individual images which are separately licensed.